At a local university, the Student Commission on Programming and Entertainment (SCOPE) is preparing to host its first rock concert of the school year. To successfully produce this rock concert, SCOPE has listed the requisite activities and related information in the following table (duration estimates measured in days).

Immediate

Most

Activity

Predecessor(s)

Optimistic

Probable

Pessimistic

A:

Negotiate contract with

-

9

10

11

selected musicians

B:

Reserve site

-

7

9

11

C:

Manage travel logistics

A

1

6

8

for music group

D:

Screen & hire

B

3

4

5

security personnel

E:

Arrange advertising

C

6

6

6

& ticketing

F:

Hire parking staff

A, D

7

8

15

G:

Arrange concession sales

E

5

6

10

e. What is the likelihood that the project will be completed within 30 days? If required, round your answer to four decimals. Note: Use Appendix B to identify the probability.

Likelihood = .9131

g. Using all paths through the project network, estimate the probability that the project will be completed within 30 days. Compare your answer to the answer in part e and explain. Round your answers for  values to 2 decimal places and for probability values to 4 decimal places.

For path B-D-F:

z= [          ]

Cumulative probability  [          ]

For path A-F:

z=  [          ]

Cumulative probability  [          ]

P(entire project completed) [          ]

I created my own spreadsheet and calculated the variance, standard deviation, critical path, ES, LS, EF, LF etc. This is the only portion of the question that just isn't making sense. All of my calculations when I input into the answers in (g) are incorrect. Just need help understanding.

ACTIVITY OPTIMISTIC MOST PROBABLE PESSIMISTIC EXPECTED TIMES VARIANCE STANDARD DEVIATION CRITICAL PATH
A 9 10 11 10.000000000 0.111111111 0.285714286 A-C-E-G
B 7 9 11 9.000000000 0.444444444 0.571428571 A-F
C 1 6 8 5.500000000 1.361111111 1.000000000 B-D-F
D 3 4 5 4.000000000 0.111111111 0.285714286
E 6 6 6 6.000000000 0.000000000 0.000000000
F 7 8 15 9.000000000 1.777777778 1.142857143
G 5 6 10 6.500000000 0.694444444 0.714285714
0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Problem 9-09 (Algorithmic) At a local university, the Student Commission on Programming and Entertainment (SCOPE) is...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • At a local university, the Student Commission on Programming and Entertainment (SCOPE) is preparing to host...

    At a local university, the Student Commission on Programming and Entertainment (SCOPE) is preparing to host its first rock concert of the school year. To successfully produce this rock concert, SCOPE has listed the requisite activities and related information in the following table (duration estimates measured in days). Activity Predecessor(s) Optimistic Probable Pesssimistic A: Negotiate contract with - 9 10 14 selected musicians B: Reserve site - 6 8 10 C: Manage travel logistics A 4 6 11 for music...

  • The following table shows estimates of activity times (weeks) for a project: Activity Optimistic Time Most...

    The following table shows estimates of activity times (weeks) for a project: Activity Optimistic Time Most Probable Time Pessimistic Time A 3 4.5 9 B 1.5 2 2.5 C 5 6 7 D 4 4.5 8 E 5 6 7 F 1 2.5 7 G 7 9 11 Suppose that the critical path is A-B-D-F-G. Use Appendix A to answer the questions. Do not round intermediate calculations. Round your answers to three decimal places. What is the probability that the...

  • Activity Predecessor Optimistic Time (a) Most Probable Time (m) Pessimistic Time (b) A None 2 6...

    Activity Predecessor Optimistic Time (a) Most Probable Time (m) Pessimistic Time (b) A None 2 6 10 B None 2 4 6 C A 2 4 6 D A 4 6 8 E B 6 8 22 F B 6 8 10 G C,D 2 8 12 H E,F 2 7 12 I G,H 4 8 16 Question for Blank 1: What is the Critical Path? Question for Blank 2: What is the Expected Duration of the Project? round to...

  • activity preceding optimistic probability pessimistic a -- 7 9 14 b a 2 2 8 c...

    activity preceding optimistic probability pessimistic a -- 7 9 14 b a 2 2 8 c a 8 12 16 d a 3 5 10 e b 4 6 8 f b 6 8 10 g c,f 2 3 4 h d 2 2 8 i h 6 8 16 j g,i 4 6 14 k e,j 2 2 5 a. What is the estimated time of completing the project if the critical path is A-D-H-I-J-K? b. calculate the project...

  • 123) Given (Time in weeks): Activity Optimistic Most Likely Pessimistic A 3 4 5 B 6...

    123) Given (Time in weeks): Activity Optimistic Most Likely Pessimistic A 3 4 5 B 6 7 14 C 2 3 10 D 6 9 12 E 4 5 12 F 1 3 11 G 1 2 9 H 2 5 8 I 1 4 7 Determine: (a) the critical path. ( HOW DO I DO THIS WITH OUT A PREDECESSOR?) (b) the probability that the project will be completed in 22 weeks.

  • QUESTION 1 G E. H. C A Finish Start D. Complete the network activity diagram using the table below to answer questio...

    QUESTION 1 G E. H. C A Finish Start D. Complete the network activity diagram using the table below to answer questions 1-15. The expected activity completion times are provided in days. Each question is 1 point. Most Probable Activity Optimistic Pessimistic A 7 B 12 C 5 12 7 E 10 15 20 6 9 18 G 6 13 H 11 What is the early start (ES) time for activity F? 13 12 10 None of the above are...

  • Consider the following project, all durations are in days. Find the critical path and which tasks...

    Consider the following project, all durations are in days. Find the critical path and which tasks have slack. What is the probability the project will be done in 50 days? How about in 53 days? Suppose any task can be crashed for up to two days for the same cost per day, but that tasks A and N cannot be crashed at all. Which tasks should be crashed if the project needed to be completed in 45 days with at...

  • Given the following activity list and times in days: (15 points) Activity           Optimistic       Most Likely     Pessimistic...

    Given the following activity list and times in days: (15 points) Activity           Optimistic       Most Likely     Pessimistic                         Time                Time                Time A                     7                      10                    12 B                     6                      8                      14 C                     5                      9                      12 D                     12                    14                    21 E                      10                    12                    15 F                      4                      5                      8 G                     1                      3                      8 H                     12                    15                    17 NOTE 1: ASSUME THE CRITTCAL PATH IS “B-E-H”. Calculate the schedule duration of the critical path in days. What is the probability of the project being completed...

  • Estimated activity times and precedences are given below: Activity Optimistic Most Likely Pessimistic Required Precedence A...

    Estimated activity times and precedences are given below: Activity Optimistic Most Likely Pessimistic Required Precedence A 6 7 14 B 8 10 12 C 2 3 4 D 6 7 8 A E 5 5.5 9 B, C F 5 7 9 B, C G 4 6 8 D, E H 2.7 3 3.5 F What is the probability that the project will be completed within: A. 21 Days B. 22 Days C. 25 Days

  • Consider the following network for a small maintenance project (all times are in days). [7 Marks]...

    Consider the following network for a small maintenance project (all times are in days). [7 Marks] Activity Immediate Predecessor [s] Optimistic Time Most Likely Time Pessimistic Time A - 2 3 4              B - 5 6 7 C - 5 6 7 D A 3 4 5 E A 2 3 4 F C 3 4 5 G C 8 10 16 H B, E, F 5 6 7 I B, E, F 7 11 15 J B, E,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT