Question

Activity-on-node networks are a visual representation of the flow of a project. They typically indicate precedence...

Activity-on-node networks are a visual representation of the flow of a project. They typically indicate precedence relationships, estimated activity durations, and estimated start times. Give two examples of decisions you might make as a manager based on the information within an activity-on-node network.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Based on Activity on Node networks, those are a visual representation of the flow of a project. Here, they will indicate precedence relationships, estimated activity durations and estimated start times. With such Activity on Node, following are the decisions we could take, these are as stated below:

  • Here, we can understand that how many days or periods of time project will take at least to finish, here, critical path is maximum time taken or maximum duration path, and project will take the same time that is considered like least time to complete. Hence, we can decide that when we can expect that project will complete by? For example, looking at the AON network diagram, we can decide that project will complete by 24 November, we also can decide to follow such diagram during project executing and we can review any deviation during project execution time and update the network diagram.
  • We also can decide that which activities should be crashed when it is necessary, let’s say, we should crash critical path activities first, and we also can decide that activities will be crashed with least extra cash, here, we will be evaluating activities, those are to be crashed. Further, we can decide which activities have more risk or uncertainties. Activity with higher value of standard deviation or variance, will have more uncertainties or risk, here, standard deviation can be calculated using formula, (pessimistic time – optimistic time)/6,
Add a comment
Know the answer?
Add Answer to:
Activity-on-node networks are a visual representation of the flow of a project. They typically indicate precedence...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Must use AOA PERT/CPM Manual Calculations and show Networks. 10. A farm owner is going to...

    Must use AOA PERT/CPM Manual Calculations and show Networks. 10. A farm owner is going to erect a maintenance building with a connecting electrical generator and water tank. The activities, activity descriptions, and estimated durations are given in the following table: Activity Activity Activity Activity Description Predecessor Time Excavate Erect building Install generator Install tank Install maintenance equipment Connect generator and tank to building b.c,d Paint finish Η Check out facility Construct the network for this project and calculate the...

  • he he tolenwine table presents the aetivitiles of s small grojest and thetr tme The precedence relationships among the activities are also p Duration Activity Predecessor 2 4 C, D, E Draw the...

    he he tolenwine table presents the aetivitiles of s small grojest and thetr tme The precedence relationships among the activities are also p Duration Activity Predecessor 2 4 C, D, E Draw the network of the project showing the activities and their time durations Note that this should be a AON network). a) Using the time durations for each activity, determine the critical path for the project network. b) decide whether on. She 52. The local operations manager for the...

  • Problem 17-12 A project manager has compiled a list of major activties that will be required...

    Problem 17-12 A project manager has compiled a list of major activties that will be required to nstall a computer Information system in her firm. The st Includes estimated completion times for activties and precedence relationships. Use Table B1 and Table B2. Immediate Est mated Times 6-8-10 7-9-12 2-3-5 3-4-8 2-2-3 2-3-6 3-4-5 4-5-8 S-8-12 H. G, K, O If the project is tinished within 26 weeks of its start, the project manager will recelve a bonus of S1,000; and...

  • A project manager has compiled a list of major activities that will be required to install...

    A project manager has compiled a list of major activities that will be required to install a computer information system in her firm. The list includes estimated completion times for activities and precedence relationships. (Z-Table is needed) Activity Immediate Predecessor Estimated Times (weeks) A — 2-4-6 D A 6-8-10 E D 7-9-12 H E 2-3-5 F A 3-4-8 G F 5-7-9 B — 2-2-3 I B 2-3-6 J I 3-4-5 K J 4-5-8 C — 5-8-12 M C 1-1-1 N...

  • Question 16 4 points Save Answe The following provides information about a project, including a list...

    Question 16 4 points Save Answe The following provides information about a project, including a list of activities and precedence relationships, activity durations (normal and "crash" times), direct activity costs (normal and "crash"), indirect costs for the project, as well as calculated crash costs/day and the maximum amount that each activity can be shortened (crashed) by. There are no penalty costs for this project. Total project cost (using normal times), a network diagram, and the four paths and durations have...

  • Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal a spoke plastics forming machine at a local manufacturing site. At this pre-project ph...

    Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal a spoke plastics forming machine at a local manufacturing site. At this pre-project phase, it has sembled a project planning team and is undertaking discussions with the client to produce a mgheve pct plan. A range of key tasks have been identified and a logical network diagram for high-level the project has been developed. Project task information is provided in the following table (Table...

  • A project manager has compiled a list of major activities that will be required to install...

    A project manager has compiled a list of major activities that will be required to install a computer information system in her firm. The list includes estimated completion times for activities and precedence relationships. (Use Table B1 and Table B2.) (table B1) (table b2) Immediate Predecessor Estimated Times (weeks) A — 2-4-6                    D A 6-8-10                    E D 7-9-12                    H E 2-3-5                    F A 3-4-8                    G F 5-7-9                    B — 2-2-3                    I B 2-3-6                    J I 3-4-5                    K J 4-5-8                    C...

  • Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal...

    Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal a spoke plastics forming machine at a local manufacturing site. At this pre-project phase, it has sembled a project planning team and is undertaking discussions with the client to produce a mgheve pct plan. A range of key tasks have been identified and a logical network diagram for high-level the project has been developed. Project task information is provided in the following table (Table...

  • Microsoft Project Assignment Description A system development project has been defined to contain the following list of...

    Microsoft Project Assignment Description A system development project has been defined to contain the following list of activities along with their estimated times for completion. The project will start on 5/1/2019. Project Data Provided: Activity ID Activity Name Days Predecessors Optimistic(O) Realistic(R) Pessimistic(P) 1 Gather Requirement 1 2 3 2 Analyze processes 1 2 6 1 3 Define DFDs 0.5 1 1.5 2 4 Design Processes 2 7 12 2 5 Design database 4 7 22 3 6 Design UI...

  • 1. When finding the approximate probability of project duration, it is necessary to know which of...

    1. When finding the approximate probability of project duration, it is necessary to know which of following? a. The mean and variance of each activity b. The mean of each activity on the CP c. The sd of only the activities on the CP d. Each activity's probability of completion e. The distribution of activity times 2. The sd of a path is computed as: a. the sum of the sd of all activities on the path b. the square...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT