AlamoPrint is a small printing company who currently have several contracts from manufacturers of Italian foods. For these customers AlamoPrint prints two products – boxes for pizzas and wrappers which are wrapped around foil pasta dishes. Demand is strong for these two products and AlamoPrint can sell all the boxes and wrappers it can print.
AlamoPrint delivers the printed goods to its customers and has a maximum delivery capacity per working day of 60000 wrappers or 30000 boxes or an equivalent combination of both.
Two people are employed who set up the printing machines, load and unload work on to the machines, and pack finished material. Each person is employed for 8 hours per day, the length of the working day at AlamoPrint, and can complete the tasks require for a batch of 500 wrappers in 5 minutes and for a batch of 100 boxes in 6 minutes. Both people can switch seamlessly between tasks.
AlamoPrint has two machines each of which can print either boxes or wrappers during the 8 - hour working day at the rate of 200 wrappers per minute or 10 boxes per minute.
It is hot work producing boxes, so for health and safety reasons production of boxes, by all processes, is limited to a maximum of 20% of total production of boxes and wrappers.
If AlamoPrint charges $5 for 100 boxes and $2 for 100 wrappers, how many should it plan to print each 8 - hour working day to maximize income? In deriving your answer, exact values for decision variables (i.e. results accurate to the nearest two decimal places) are required. You may also assume that fractional values for decision variables are acceptable, because production is continuous. You must develop an LP model for this problem and solve it using graphical method.
LP model is following:
Let W and B be the number of wrappers and boxes to be produced.
Max 2W/100 + 5B/100
s.t.
W/60000 + B/30000 <= 1 or, W + 2B <= 60000 (whole eqn multiplied by 60000)
5W/500 + 6B/100 <= 2*8*60 or, W + 6B <= 96000 (whole eqn multiplied by 100)
1W/200 + 1B/10 <= 2*8*60 or, W + 20B <= 192000 (whole eqn multiplied by 200)
B <= 20%*(W + B) or, -.2W+.8B <= 0
W, B >= 0
Solution using graphical method is following:

Optimal production plan:
Number of Wrappers to be produced = 45,333.33
Number of Boxes to be produced = 7,333.333
total profit = $ 1,273.33
AlamoPrint is a small printing company who currently have several contracts from manufacturers of Italian foods....
Abrasives Corp. manufactures industrial diamonds for use in the cutting, machining and drilling industries. They produce the highest quality diamonds in the industry, and can sell any amount they can produce for $5 per carat. Abrasive Corp runs 24 hours per day, 7 days per week. Abrasive Corp.’s production process has six steps: Graphite Core Manufacturing: There are two machines, each capable of producing 14 cores per hour. Ceramic Tube Manufacturing: There are three machines, each capable of producing 16...
Abrasive Corp. (Use this information for the next 6 questions) Abrasives Corp. manufactures industrial diamonds for use in the cutting, machining and drilling industries. They produce the highest quality diamonds in the industry, and can sell any amount they can produce for $5 per carat. Abrasive Corp runs 24 hours per day, 7 days per week. Abrasive Corp.'s production process has six steps: Graphite Core Manufacturing: There are two machines, each capable of producing 14 cores per hour. Ceramic Tube...
Problem 4 company manufactures three types of heaters, Hi, Ha, and Hs, using two ra, and ts, respectively, that can be manufactured per hour in order to machines, M and M2. The price charged for each of the three heaters is and $88, respectively. Determine the number of each type of heater, maximize the company's hourly revenue. Each heater Hi takes 2 minutes on machine M, and 5 minutes on machine M2. Each heater H2 takes 8 minutes on machine...
You make fancy, custom l light fixtures. You currently have orders from four important customers. The list below describes the work (the load) that is currently in production, which works 8 hours per day, M-F, with one highly skilled employee. There is no other work in the work center, it is the beginning of the day 3/4, a Monday, no work has been done on any job. Work must be completed by NOON of the day it is due to...
Hello, could you please answer and explain the questions BELOW and please explain in great detail to how you got each answer by explaining it to me step by step, please. thanks! Question - You are analyzing a tea bag production line. (You just love tea.) There are five processes, labeled A through E, and your tea bags start at Process A, then go to Process B, C, D, and E. The process map looks a bit like this: Start...
Gary’s Gears is a production facility that produces metal gears. The first step is stamping, which happens at a press. There are two identical presses that operate simultaneously (gears can be stamped on either press). A press stamps one part at a time. It takes 1 minute to stamp a part, including loading and unloading. Before beginning a new batch of parts, there is a 20-minute setup involving die change. The batch size is 100 parts. In other words, after...
BF SWINGS
Ben Floyd really enjoyed wood shop in high school, so he used an
inheritance to buy some basic woodworking tools. He started out
doing odd jobs, and then one day he made a porch swing for his
house. Several people saw it and asked him to make one for them.
Word of mouth brought him many customers. In June of 1991 he
married Bobbie Ruth, a marketing graduate. Bobbie Ruth saw a chance
to expand the swing business...
Kristen’s Cookie Company You and your roommate are preparing to start Kristen’s Cookie Company in your on-campus apartment. The company will provide fresh cookies to starving students late at night. You need to evaluate the preliminary design for the company’s production process to figure out how many orders to accept and how effectively your time, and that of your room mate, will be utilized. BUSINESS CONCEPT Your idea is to bake fresh cookies to order, using any combination of ingredients...
Mini Case: Kristen’s Cookie Company You and your roommate are preparing to start Kristen’s Cookie Company in your on-campus apartment. The company will provide fresh cookies to starving students late at night. You have done a preliminary market analysis and are confident that you can charge a price that is high enough to make a good profit, but low enough to maintain reasonable demand. Business Concept Your idea is to bake fresh cookies to order, using any combination of your...
Operations at Burger King. – Have it your way Burgers are cooked in an infrared broiler. Three continuous chains pass through the broiler. Two are for meat, which take 80 seconds to make one pass, and one chain is for buns, which moves twice as fast. Each meat chain can handle 8 burgers per minute or 5.5 Whoppers. There is a two foot loading space at the beginning of each chain. At the end of the chain patties fall into...